EPCplanner integrates Primavera P6 schedules, commercial progress measurement, engineering deliverables, procurement tracking, subcontract management, forecasting, and reporting into a single database-driven platform. One Project. One Database. One Version of the Truth.
Primavera P6 remains the master schedule holding critical Level 3 CPM logic (typically 5,000 to 10,000 activities). However, tracking thousands of individual deliverables down to Level 4/5 inside P6 creates bloat and confusion across teams.
EPCplanner carries the deep operational detail — Engineering document registers, Procurement PRs, Subcontract deliverables — inside a structured register database and feeds synchronized progress seamlessly back to P6.
"One Project. One Database. One Version of the Truth."Learn more about our approach →
Traditional: Scattered across multiple Excel files held by different teams.
EPCplanner: One project database covering schedule, commercial, and register data.
Traditional: Closed-period figures can be silently edited; no tracing.
EPCplanner: Freeze Guard blocks retroactive entry once a Cut-Off Date is locked.
Traditional: Progress and invoicing tracked in loosely reconciled files.
EPCplanner: CBS, Activity Weight Factors, and Cost/Invoice workflows are strictly linked.
Every module shares the same underlying relational database, WBS node structure, and reporting period architecture.
XER import and live Oracle / SQL Server / SQLite connection with two-way schedule synchronization.
Lump-sum price schedule, BOQ mapping, automated Weight Factor allocation, and invoice generation.
Document-centric lifecycle tracking with configurable stage templates, gate rules, and IDC checks.
PR tracking, subcontractor deliverable frameworks, and milestone payment integration.
Lookahead logic, multi-period trend matrices, and automatic behind-schedule identification.
Multi-level S-curves, resource histograms, and print-ready PDF / Excel / HTML dashboards.
Giving clients, PMC teams, and financial auditors absolute trust in every historical data point.
Closing a reporting window automatically freezes register states, S-curve points, and CBS variables — ready for delay analysis at any future date.
Prevents modifications or retroactive entries within closed cut-off periods from any account type, including system administrators.
A comprehensive registry tracking baseline modifications, permission changes, and document validation procedures with non-alterable timestamps.
Explore the complete EPCplanner workflow including project setup, Primavera P6 integration, CBS configuration, register management, forecasting, reporting, governance controls, and Management of Change.